Meningkatkan Kapasitas Produksi Ford Line Menggunakan Metode Lean Manufacturing dengan Pendekatan VSM di PT. RST
Abstract
Keywords
Full Text:
PDFReferences
Alvarez R, Calvo R, Pena MM and Domingo R “Redesigning an assembly line through lean manufacturing tools”. International Journal of Advance Manufacturing Technology Vol 43
Cooper, D. & Schindler, P. “Business Research Method,” , Edisi sebelas, New York : McGraw-Hill, 2011,
Salem, O., Solomon J, Genaidy, A, & Minkarah “Lean Construction : from theory to implementation” Journal of Management in Engineering Vol 22 No 4 (2006)
Vinodh, S., Arvind, K.R & Somanaathan M (2010). Application of Value Stream Mapping in an Indian camshaft manufacturing organization, Journal of Manufacturing Technology Management Vol 21 No 7
DOI: https://doi.org/10.33373/sigmateknika.v4i1.3225
Refbacks
- There are currently no refbacks.
E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id