IMPLEMENTASI METODE HOUSE OF RISK PADA EVALUASI KETERLAMBATAN PROYEK RENOVASI GEDUNG AULA PP3 BLITAR UM
Abstract
CV. DDD is a company engaged in construction services. In the construction of the Pp3 Blitar Hall renovation project, State University of Malang, there was a delay in project completion which had an impact on the quality of the project. In project work, there are several things that are required to be taken into consideration including finance, equipment, materials, labor, and time. So based on these considerations, the work in a project can be carried out properly. Project management needs to be done, so that the smooth running of the project can be carried out properly and optimally. The purpose of this study is to identify risk events and risk agents the factors that cause project delays. House of Risk is the method used in this research. The results of this study are the identification of risk events against the analysis of project delays, there are twelve risk events and 15 potential causes of risk events. This research also produces scenarios of five priority mitigation strategies, namely purchasing materials planned for weekly or monthly needs, looking for closer suppliers, buying lots at lower prices and sufficient safety stock and applying the material requirements planning method to find out more details of the lead time of each material.
Keywords
Full Text:
PDFReferences
S. S. S. Abu, “Factors Affecting the Performance of Construction Project in the Gaza Strip,” Eng. Constr. Archit. Manag., vol. 25, no. 2, pp. 657–667, 2017, [Online]. Available: http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Factors+Affecting+the+Quality+of+Design+and+Contractual+Documents+in+Gaza+Strip#0%0Ahttps://doi.org/10.1016/j.proeng.2017.01.214.
A. Enshassi, S. Mohamed, and S. Abushaban, “Factors affecting the performance of Construction projects in the Gaza Strip,” J. Civ. Eng. Manag., vol. 15, no. 3, pp. 269–280, 2009, doi: 10.3846/1392-3730.2009.15.269-280.
B. P. Dwiputranto and I. K. Sucita, “Analisis Keterlambatan Pada Proyek Apartemen Berkonsep Transit Oriented Development (TOD),” J. Poli-Teknologi, vol. 19, no. 1, pp. 63–70, 2020, doi: 10.32722/pt.v19i1.2726.
A. Bakhtiyar, A. Soehardjono, and M. H. Hasyim, “Analisis faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi pembangunan gedung di kota lamongan,” J. Rekayasa Tek. Sipil, vol. 6, no. 1, pp. 55–66, 2012.
M. Simanjuntak and A. Salim, “Analisis Pilot Project Risiko Keterlambatan Proyek Pilot Project Analysis of Project Delay Risk,” SNITT- Politek. Negeri Balikpapan, vol. 9, no. 2, pp. 401–410, 2020.
J. W. Soetjipto, N. H. Qudsy, and S. Arifin, “Analisis Risiko Keterlambatan Proyek Menggunakan Metode House of Risk,” J. Appl. Civ. Eng. Infrastruct. Technol., vol. 2, no. 1, pp. 19–26, 2021, doi: 10.52158/jaceit.v2i1.149.
D. S. Nurhuda, W. Sutrisno, and D. L. C. Galuh, “Analisis Risiko Keterlambatan Waktu Pada Pelaksanaan Proyek Pembangunan SPBU (Studi Kasus di Kabupaten Bantul, Yogyakarta),” Bangun Rekaprima, vol. 05, no. 2, pp. 19–28, 2019.
M. A. Rosdianto, “Analisa Risiko Keterlambatan Proyek Pembangunan Apartemen Di Apartemen Taman,” Tesis, pp. 1–139, 2017.
I. N. Pujawan and L. H. Geraldin, “House of risk: A model for proactive supply chain risk management,” Bus. Process Manag. J., vol. 15, no. 6, pp. 953–967, 2009, doi: 10.1108/14637150911003801.
I. N. Putri, “Analisis Risiko Kegagalan Produk Mempengaruhi Kualitas Pelayanan Menggunakan House Of Risk Dan Supply Chain Operations Reference,” Jurnal Optimasi Teknik Industri (JOTI), vol. 2, no. 1. pp. 19–23, 2020, doi: 10.30998/joti.v2i1.4049.
R. Lestari, “Pengendalian Jadwal Proyek Isolasi Boiler Dengan Metode Time Cost Trade Off Dan Penerapan Software Primavera Di PT Athirah Gemilang Mandiri,” Jurnal Optimasi Teknik Industri (JOTI), vol. 3, no. 1. pp. 28–32, 2021, doi: 10.30998/joti.v3i1.9275.
R. A. Kurniawan, Ni. A. Mahbubah, and M. Z. Fathoni, “ANALISIS KEMAJUAN PROYEK MAINTENANCE ISOLASI DENGAN METODE EARNED VALUE (Studi Kasus CV. HASIL),” JUSTI (Jurnal Sist. dan Tek. Ind., vol. 2, no. 3, pp. 382–391, 2021.
DOI: https://doi.org/10.33373/sigmateknika.v5i2.4591
Refbacks
- There are currently no refbacks.
E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id