ANALISA RUGI-RUGI DAYA (LOSSES POWER) PADA JARINGAN TEGANGAN RENDAH PT. MUSIMAS BATAM
Abstract
PT. MUSIMMAS BATAM is one of the largest integrated palm oil companies in the world that requires a three-phase voltage supply of approximately 250 amperes for each phase. PT. Musimmas Batam is supplied from a 150,000 KVA transformer through the LVMDP Panel, with priority on supplying electricity needs. The 3-phase voltage values are obtained, namely: R-S = 404.4 V, R-T = 404.2 V, S-T = 404.1 V with a neutral voltage of R-N = 23.2 V, S-N = 23.1, T-N = 23.3. And the 3-phase current IR = 202.9 Amperes, IS = 213.7 Amperes, IT = 200.7 Amperes. Total Power Calculation at LVMDP based on the equation looking for Iaverage = 205.7 A, Based on the equation looking for Vaverage = 1212.7 V, Based on the equation looking for P = 241.9 Kw. Power losses for a 400 mm² wire (R = 0.047 Ω/km) is 46.6 watts/km = 0.046 kW/km, and the total length of the conductor cable from the LVMDP Panel to the Load 500 M with the calculation of power losses, namely : P = 4833 watts/km. While the total power supply is 8.0 Kw = 8000 watts, so it can be seen = 3167 watts/km (3.16 Kw). Where is the active power of the transformer (P) = 145.5 kW. Thus, the percentage of losses due to neutral currents in the neutral conductor of the transformer is 0.03%.
Key word : LVMDP Panels, Cables, Loads
Full Text:
PDFReferences
Pansini, A.J. 2007. Electrical Distribution Engineering, Third Edition, The Fairmont, Inc., Indian Trail.
Dwi Cahyanto, Restu. 2008. Studi Perbaikan Kualias Tegangan Dan Rugi-Rugi Daya Pada
Penyulang Pupur Dan Bedak Menggunakan Bank Kapasitor, Trafo Pengubah Tap Dan Penggantian Kabel Penyulang. Jakarta: Elektro UI.
Tjahjono, “Analisa Perbaikan Losses Dan Jatuh Tegangan Pada Jaringan Sambungan Rumah Tidak Standar Dengan,” J. Media Elektro, vol. 4, pp. 6–7, 2013.
Tjahjono, “Analisis tegangan dan losses pada jaringan distribusi terhadap pemasangan pembangkitan distribusi,” J. Media Elektro, vol. 7, no. 1, 2010.
Kurniawan, “Analisa jatuh tegangan dan penanganan pada jaringan distribusi 20 kv rayon palur pt. pln (persero) menggunakan etap 12.6,” J. Tek. elektro, vol. 2, p. 9, 2016.
Hari Putranto dan Ratih Novalina Putri, “Analisa Perhitungan losses Pada Jaringan Tegangan Menengah Dengan Perbaikan Pemasangan Kapasitor,”J. Intake, vol. 20, pp. 23–28, 2013.
S. Sampeallo, W. F. Galla, and R. A. Oematan, “Analisis Jatuh Tegangan Pada Penyulang 20 kV Berdasarkan pada Perubahan Beban (Studi Kasus Penyulang Penfui dan Penyulang Oebobo PT. PLN Persero Rayon Kupang),” J. Media Elektro, vol. 1, no. 3, pp. 111–118, 2013
DOI: https://doi.org/10.33373/sigmateknika.v6i1.5117
Refbacks
- There are currently no refbacks.
E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id