PENERAPAN METODE STUDI WAKTU DAN GERAK PADA PROSES PACKING DI PT. ABC
Abstract
Keywords
Full Text:
PDFReferences
A.T. Bon, dan D, Daim, “Time Motion Study in Determination of Time Standard in Manpower Process, dalam Proceedings of EnCon2010 3rd Engineering Conference on Advancement in Mechanical and Manufacturing for Sustainable Environment, Kuching, Sarawak, Malaysia, 2010.
Duran, C; Cetindere, A; Aksu, Y.E. (2015). Productivity improvement by work and time study technique for earth energy-glass manufacturing company”. [Online]. ScienceDirect: Procedia Economics and Finance. 26, hal. 109-113. Tersedia: www.sciencedirect.com.
Manaruzzaki, A; Suhardi, B; Andriyani, H.T; Tyastuti, N.U. (Januari-Februari 2022). “Literature Review: The Importance of Working Time Measurement in the Manufacturing Industry to Increase Company Productivity (Case in Indonesia)”. Asian Journal of Social Science and Management Technology. [Online]. 4 (1). Tersedia: http://www.ajssmt.com.
Masniar; Marasabessy, U.R; Astrides, E; Ahistasari, A; Wahyudien, M.A.N; Rachmadhani. (Mei, 2023). M.M, “Analysis of Work Measurement Using the Stopwatch Time Study Method at PTEA”. JISEM: Journal of Industrial System Engineering and Management [Online]. 2 (1), Tersedia: https://journal-jisem.com/index.php/jisem/article/view/14
Maulana, R. (2017). “Analisa Produktivitas Kinerja Dengan Metode Time and motion study Pada Bengkel Motor di Palembang”. Integrasi Jurnal Ilmiah Teknik Industri. [Online]. 2 (1), hal. 25-28. Tersedia: http://jurnal.um-palembang.ac.id/integrasi/index.
Nurhayani. Juli-Sept. (2022). “Analisis sektor industri manufaktur di Indonesia”. Jurnal Paradigma Ekonomika. [Online]. 17 (3), hal. 713-722.
Prakash, C; Rao, B.P; Shetty, D.V; Vaibhava S. (August, 2020). “Application of time and motion study to increase the productivity and efficiency”. First International Conference on Advances in Physical Sciences and Materials. IOP Publishing. Journal of Physics: Conference Series 1706 (2020). Tersedia: https://iopscience.iop.org/article/10.1088/1742-6596/1706/1/012126/meta.
Rajiwate, A; Mirza, H; Kazi, S; Momin, M.M. (Mar, 2020). “Productivity Improvement by Time Study and Motion Study”. International Research Journal of Engineering and Technology (IRJET). [Online]. 7(3), hal. 5308-5312.Tersedia: http://www.irjet.net
Suhardi, B., “Telaah Metode,” dalam Perancangan Sistem Kerja, edisi ke-1, Surakarta, Indonesia: UNS Press, 2015, hal: 44-58.
Zadry, H.R; Susanti, L; Yuliandra, B; Jumeno, D., “Studi Pengukuran Waktu dan Gerakan,“ dalam Analisis Dan Perancangan Sistem Kerja, edisi ke-1, Padang, Indonesia: Andalas University Press, 2015, hal. 1-11 .
DOI: https://doi.org/10.33373/sigmateknika.v6i2.5633
Refbacks
- There are currently no refbacks.
E-ISSN 2599-0616
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Sigma Teknika
Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam
Jl. Batu Aji Baru No.99 Batu Aji
Email: sigmateknika@journal.unrika.ac.id