THE ANALIZE OF WASTE ELIMINATION ON SA CONTACT BLOCK TO INCREASED THE OUTPUT BY LEAN MANUFACTURING METHOD (STUDI CASE: PT SCHNEIDER ELECTRIC)

Abdullah Merjani, Nadila Afriantika

Abstract


PT. Schneider Electric Manufacturing is a global company leading digital transformation in the fields of energy management and automation. PT. Schneider its prioritizes continuous improvement to control the production process.
These include modular and Monoblock sub-assemblies. In controlling effectiveness in a production system it should be a good level on utility (utilization), but after analysed it found low utilization on line production Monoblock many problems with waste from production operators, material transfer and waiting times due to unbalanced processes resulting in less output. (not reaching the target) this has a huge impact on efficiency and productivity.
To increase output and utility, use 3 lean manufacturing methods, including Kaizen, Line balancing and Kanban super market to improve overcome problems in the production area. After implementation, utility and output become better.

Full Text:

PDF

References


Alba-Baena, N. (2023). Lean-Sigma as a Strategy in Supply Chain Management During the COVID-19 Pandemic Crisis-Lessons Learned. In Supply Chain Management Strategies and Methodologies: Experiences from Latin America (pp. 123-147). Cham: Springer International Publishing.

Al Faritsy, A. Z. (2013). Meningkatkan Kualitas dengan Metode Lean Sigma dan Kaizen.

Anggraini, W., Hutagalung, M., Nofirza, & Nurainun, T. (2018). Value Stream Mapping Pada Proses Produksi Plywood. Seminar Nasional Teknologi Informasi Komunikasi dan Industri, (pp. 507-516).

Arrizal, L. T., Sudiarso, A., & Herliansyah, M. K. (2021, November). MINIMALISASI WASTE PADA PROSES PRODUKSI BATIK CAP MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING. In

Barbara, C., & Agnieszka, Z. 2014, Elemination of waste in Production enterprises –case study. ISSN 2083-4942, Vol.4 No.2 , pp 157 – 166.

Denish, B.M, & Hemant, T. 2014. Lean thinking : Reduction of waste, lead time, Cost through Lean manufacturing tools and technique. ISSN 2250 – 2459,ISO 9001 : 2008 Certified Journal,Volume 4,Issue 3,March 2014)

Gaspersz, V. (2012). All-in-one Production and Inventory Management For Supply Professional Strategi Menuju World Manufacturing. Bogor: Vinchristo Publication.

Guntoro, R. C., & Adhiana, T. P. (2020, June). Identifikasi Waste Menggunakan Metode Waste Assessment Model. In Prosiding Seminar Nasional LPPM Unsoed (Vol. 9, No. 1).

Kholil, M., Rudini, M. 2016. Minimasi waste dan usulan peningkatan efisiensi proses produksi MCB ( Mini Circuit Breaker ) dengan pendekatan sistem Lean manufacturing ( di PT. Schneider Electric Indonesia ).Jurnal PASTI, Vol.VII No.1, halaman 44-70.

Lestiana, F., Rachmawaty, D., & Munang, A. (2022). Minimasi Waste Pada Proses Produksi PT. Astra Honda Motor (AHM) Dengan Konsep Lean Manufacturing. Jurnal Ilmiah Teknik Industri, 10(1), 48-56.

Majid, M. (2018). Identifikasi Dan Pengurangan Waste Pada Proses Produksi Minuman Herbal Instan Menggunakan Value Stream Mapping.

Nurlaila, Q., Yuniawati, R. I., Susanti, L., & Cahyati, A. (2023). LEAN MANUFACTURING. Penerbit Widina.

Prosiding Seminar Nasional Industri Kerajinan dan Batik (Vol. 3, No. 1, pp. D- 02).

Ristyowati, T., Muhsin, A., & Nurani, P. P. (2017). Minimasi Waste Pada Aktivitas Proses Produksi Dengan Konsep Lean Manufacturing (Studi Kasus di PT. Sport Glove Indonesia). Jurnal Optimasi Sistem Industri, X(1), 85-57.

Sherif, M., & Jantanee, D. 2015, Waste elimination for manufacturing 73 sustainability. Procedia manufacturing 2 (2015 ), Halaman 11-16.




DOI: https://doi.org/10.33373/sigmateknika.v7i2.6940

Refbacks

  • There are currently no refbacks.





E-ISSN 2599-0616

 

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

Sigma Teknika

Gedung Lt.1 Kampus Universitas Riau Kepulauan Batam

Jl. Batu Aji Baru No.99 Batu Aji

Email: sigmateknika@journal.unrika.ac.id

 

 

Web Analytics