Browse Title Index


 
Issue Title
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PERANCANGAN TRAINER KIT TRAFFIC LIGHT TYPE OMRON SYSMAC CPM1A DI LABORATORIUM TEKNIK ELEKTRO Abstract   PDF
Pamor Gunoto, Jagat Pribadi
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PERANCANGAN TRAINER MOTOR INDUKSI AC 3PH BERBASIS PROGRAM LOGIC CONTROLLER Abstract   PDF
Komaruddin Komaruddin, Pamor Gunoto, Endang Susanti
 
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 PERANCANGAN TUNGKU PELEBURAN ALUMUNIUM KAPASITAS 3 KG BAHAN BAKAR GAS LPG Abstract   PDF
Agus Umar Ryadin, Rusmanto Rusmanto, Andi Masakim
 
Vol 1, No 2 (2018): Sigma Teknika Vol 1 No 2 November 2018 PERANCANGAN WIRLESS STARTER KENDARAAN BERMOTOR MEMANFAATKAN BLUETOOTH BERBASIS ARDUINO Abstract   PDF
Endang Susanti, Nelvan Candra
 
Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 PERBAIKAN KUALITAS PROSES INSPEKSI VISUAL SPARE PART DENGAN PENERAPAN TQM PADA PT.XYZ Abstract   PDF
Larisang Larisang, Dwi Nandar, sanusi sanusi, Moh. Hafidz Efendy, Pattasang Pattasang
 
Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 PERBANDINGAN ELEVASI DASAR SUNGAI BERDASARKAN HASIL ANALISIS PADA DEM DRONE, DEMNAS dan DEM SRTM Abstract   PDF
Zufrimar Zufrimar, Edwina Zainal
 
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 PERBANDINGAN PERHITUNGAN DESAIN BEJANA TEKAN SUCTION SCRUBBER VERTICAL DENGAN SOFTWARE COMPRESS CODEWARE 2010 VERSUS MANUAL Abstract   PDF
Riko Fajariadi, Qomaratun Nurlaila, Arif Rahman hakim
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 PERENCANAAN DRAINASE JALAN RAYA DI JALAN BRIGJEN KATAMSO KM 6 – KM 7 TANJUNG UNCANG, BATAM Abstract   PDF
Harry Kurniawan, Radinal Ramnuari
 
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 PERENCANAAN GEDUNG OLAHRAGA INDOOR DILIHAT DARI ASPEK FUNGSIONAL, ASPEK KUALITATIF DAN ASPEK KUANTITATIF PADA PERENCANAAN GOR TANJUNGPINANG Abstract   PDF
Supriyanto Supriyanto
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 PERENCANAAN KAPASITAS PRODUKSI ATV 32C DENGAN MENGGUNAKAN METODE CAPACITY REQUIREMENT PLANNING (CRP) (Studi kasus di PT Schneider Electric Manufacturing Batam) Abstract   PDF
Vera Methalina Afma, Herry Irwan, Rolyex Togi
 
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 PERENCANAAN KEBUTUHAN DISTRIBUSI MENGGUNAKAN PENDEKATAN DISTRIBUTION RESOURCES PLANNING PADA PERUSAHAAN BAJA COR Abstract   PDF
Dimas Akmarul Putera, Rosie Oktavia Puspita Rini, Ansarullah Lawi, Tirta Mulyadi, Wahyudi Ilham, Aulia Agung Dermawan
 
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 Perencanaan Perpipaan Air Bersih Gedung Hotel Baloi View Batam Abstract   PDF
Daniel Noviandy
 
Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 PERHITUNGAN DAN PENGUJIAN BEBAN PADA GENERATOR DI KAPAL TUGBOAT HANGTUAH V Abstract   PDF
Mr. Ricesno, Reza Nandika
 
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 Perhitungan Daya Dukung Tiang Pancang Tunggal Dan Kelompok (Studi Kasus Proyek Hangar Lion Air Batam) Abstract   PDF
Mulyono Mulyono, Dian Hastari Agustina
 
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 PERILAKU STRUKTURAL SAMBUNGAN SEKRUP SEARAH DAN BERLAWANAN ARAH PADA STRUKTUR BAJA RINGAN Abstract   PDF
Anita Dewi Masdar, Sabri Haris, Astuti Masdar
 
196 - 210 of 236 Items << < 8 9 10 11 12 13 14 15 16 > >>