|
Issue |
Title |
|
Vol 2, No 2 (2019): Sigma Teknika, VOL.2 NO.2, November 2019 |
PERENCANAAN GEDUNG OLAHRAGA INDOOR DILIHAT DARI ASPEK FUNGSIONAL, ASPEK KUALITATIF DAN ASPEK KUANTITATIF PADA PERENCANAAN GOR TANJUNGPINANG |
Abstract
PDF
|
Supriyanto Supriyanto |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
PERENCANAAN KAPASITAS PRODUKSI ATV 32C DENGAN MENGGUNAKAN METODE CAPACITY REQUIREMENT PLANNING (CRP) (Studi kasus di PT Schneider Electric Manufacturing Batam) |
Abstract
PDF
|
Vera Methalina Afma, Herry Irwan, Rolyex Togi |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
PERENCANAAN KEBUTUHAN DISTRIBUSI MENGGUNAKAN PENDEKATAN DISTRIBUTION RESOURCES PLANNING PADA PERUSAHAAN BAJA COR |
Abstract
PDF
|
Dimas Akmarul Putera, Rosie Oktavia Puspita Rini, Ansarullah Lawi, Tirta Mulyadi, Wahyudi Ilham, Aulia Agung Dermawan |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
Perencanaan Perpipaan Air Bersih Gedung Hotel Baloi View Batam |
Abstract
PDF
|
Daniel Noviandy |
|
Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 |
PERENCANAAN STRUKTUR GEDUNG DELAPAN LANTAI RUMAH SAKIT AWAL BROS, BATU AJI – KOTA BATAM |
Abstract
PDF
|
Yoga Ari Wardana, Harry Kurniawan, Edi Kusmawan |
|
Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 |
PERHITUNGAN DAN PENGUJIAN BEBAN PADA GENERATOR DI KAPAL TUGBOAT HANGTUAH V |
Abstract
PDF
|
Mr. Ricesno, Reza Nandika |
|
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 |
Perhitungan Daya Dukung Tiang Pancang Tunggal Dan Kelompok (Studi Kasus Proyek Hangar Lion Air Batam) |
Abstract
PDF
|
Mulyono Mulyono, Dian Hastari Agustina |
|
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 |
PERILAKU STRUKTURAL SAMBUNGAN SEKRUP SEARAH DAN BERLAWANAN ARAH PADA STRUKTUR BAJA RINGAN |
Abstract
PDF
|
Anita Dewi Masdar, Sabri Haris, Astuti Masdar |
|
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 |
PERMASALAHAN SUMBER DAYA AIR DALAM PENGELOLAAN DAERAH IRIGASI SANGKIR GARAGAHAN |
Abstract
PDF
|
Evince Oktarina |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
POKA YOKE TO PREVENT HUMAN ERROR AT MOULDING PROCESS OF INTEGRATED CIRCUIT ASSEMBLY |
Abstract
PDF
|
Arif Rahman Hakim, James Hellyward |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
PREDIKSI NILAI MODULUS RESILIEN LAPIS PONDASI ATAS BERDASARKAN NILAI DCP MENGGUNAKAN ALAT DYNAMIC CONE PENETROMETER PADA BEBERAPA TITIK JALAN KOTA BATAM |
Abstract
PDF
|
Mulyati Mulyati, Dian Hastari Agustina |
|
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 |
PROBLEMS REGARDING THE OPERATION OF CONTROLLED LANDFILL IN TANJUNGPINANG |
Abstract
PDF
|
Zures Gustiabani, Seow Ta Wee |
|
Vol 2, No 1 (2019): Sigma Teknika Vol.2 No.1 Juni 2019 |
PROGRAM TRAINING PENGEMBANGAN KEWIRAUSAHAAN UNTUK MENINGKATKAN KEMAMPUAN PENGELOLAAN BISNIS USAHA KECIL DAN MENENGAH (UKM) |
Abstract
PDF
|
Zaenal Arifin |
|
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 |
PROTOTIPE SISTEM MONITORING KETINGGIAN AIR PADA TANGKI BERBASIS INTERNET OF THINGS |
Abstract
PDF
|
Ade Arya Poetra, Reza Nandika, Toni Kusuma Wijaya |
|
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 |
RANCANG BANGUN DASHBOARD E-VOTING PEMILU PRESIDEN BEM SEKOLAH TINGGI TEKNIK IBNU SINA BATAM |
Abstract
PDF
|
Abdul Rohmat Basar, Benny Dwika Leonanda |
|
226 - 240 of 262 Items |
<< < 10 11 12 13 14 15 16 17 18 > >> |