|
Issue |
Title |
|
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 |
EFEK PENGGUNAAN LIMBAH TERUMBU KARANG PADA KOMPOSIT BETON |
Abstract
PDF
|
Fauzan Fauzan, Herlina Suciati |
|
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 |
Efisiensi Persediaan Kantong Semen Berbasis Metode MIN-MAX, EOQ, dan TWO-BIN di Packing Plant PT AKA |
Abstract
PDF
|
Muhammad Ryfqie Alamanda Rozaq, Nina Aini Mahbubah |
|
Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 |
EVALUASI DEFECT PRODUK SARUNG ATBM BERBASIS PENDEKATAN GREY FMEA DAN RCA |
Abstract
PDF
|
Vina Agustin Olivia, Nina Aini Mahbubah |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
EVALUASI IKLIM KESELAMATAN KERJA DIVISI PRODUKSI BERBASIS INSTRUMEN KUESIONER NOSACQ-50 DI PT MNM |
Abstract
PDF
|
Najah Maulana Ma'ruf, Nina Aini Mahbubah |
|
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 |
EVALUASI KESELAMATAN DAN KESEHATAN KERJA DENGAN METODE JOB SAFETY ANALYSIS BERBASIS PRINSIP ERGONOMI DI PT. DSM |
Abstract
PDF
|
Annisa Purbasari, Zaenal Arifin, Eka Sucandra Adi Putra Hutagalung |
|
Vol 3, No 2 (2020): SIGMA TEKNIKA, VOL.3 NO.2, NOVEMBER 2020 |
EVALUASI KINERJA DAN PENYUSUNAN ANGKA KEBUTUHAN NYATA OPERASI DAN PEMELIHARAAN EMBUNG PULAU DOMPAK DI KOTA TANJUNGPINANG, KEPULAUAN RIAU |
Abstract
Remote
PDF
|
Nadia Khaira Ardi, Harry Kurniawan, Suhendika Suhendika |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
EVALUASI KINERJA IRIGASI PADA PROGRAM IPDMIP BERBASIS EPAKSI DI KABUAPATEN PASAMAN |
Abstract
PDF
|
Rhama Fitra, Rini Mulyani, Bahrul Anif |
|
Vol 3, No 2 (2020): SIGMA TEKNIKA, VOL.3 NO.2, NOVEMBER 2020 |
EVALUASI KONDISI DAN KERUSAKAN JALAN DENGAN METODE BINA MARGA (Studi Kasus Ruas Jalan Raja M Tahir Kota Batam) |
Abstract
PDF
|
Harry Kurniawan, Imam Setyohadi, Pirhot Pakpahan |
|
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 |
EVALUASI KUALITAS PELAYANAN JUAL BELI HANDPHONE BERBASIS INTEGRASI METODE SWOT DAN QSPM |
Abstract
PDF
|
Renaldy Eka Ramadhan, Nina Aini Mahbubah |
|
Vol 6, No 2 (2023): SIGMATEKNIKA, VOL. 6, N0. 2, November 2023 |
EVALUASI PEMBOROSAN MESIN JUMBO LOOM BERBASIS PENDEKATAN STATISTICAL PROCESS CONTROL |
Abstract
PDF
|
Taraz Atillah Nofanda, Nina Aini Mahbubah |
|
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 |
EVALUASI PERAMALAN PERMINTAAN PRODUK KOPI BUBUK MENGGUNAKAN PENDEKATAN TIME SERIES DI UKM EYANG KAKUNG - GRESIK |
Abstract
PDF
|
Seftian Amiludin, Nina Aini Mahbubah |
|
Vol 3, No 1 (2020): SIGMA TEKNIKA, VOL 3 NO.1, JUNI 2020 |
EVALUASI POSTUR KERJA DI STASIUN KERJA CRIMPING SPLICE PT. XXX DENGAN METODE QUICK EXPOSURE CHECK |
Abstract
PDF
|
Annisa Purbasari, Mr. Alex, Benedikta Anna H. Siboro |
|
Vol 5, No 1 (2022): SIGMATEKNIKA, VOL. 5, N0. 1, JUNI 2022 |
EVALUASI POSTUR KERJA OPERATOR PACKING BERBASIS PENDEKATAN RAPID ENTIRE BODY ASSESMENT DI UD. XEVIPRODUCTION |
Abstract
PDF
|
Dimas Aditya Ferdiansyah, Nina Aini Mahbubah |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
EVALUASI RISIKO KESELAMATAN DAN KESEHATAN KERJA PADA PROYEK INSTALASI PIPANISASI DI PT EFE BERBASIS METODE JSA DAN HIRARC |
Abstract
PDF
|
Muhammad Ricky Wiryawan, Nina Aini Mahbubah |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
EVALUATING REAL ESTATE MARKET IN JAKARTA |
Abstract
PDF
|
Kenly Muliana Pamadi |
|
46 - 60 of 262 Items |
<< < 1 2 3 4 5 6 7 8 9 10 11 12 > >> |