|
Issue |
Title |
|
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 |
MANAJEMEN PROYEK PEMBANGUNAN RUMAH SUBSIDI PERUMAHAN DEVELY RESIDENCY |
Abstract
PDF
|
Fendi Fendi, Elita Amrina |
|
Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 |
MENATA ARSITEKTUR KOTA LAMA TANJUNGPINANG URBAN RENEWAL DESIGN OF KOTA LAMA TANJUNGPINANG |
Abstract
PDF
|
Supriyanto Supriyanto |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
Meningkatkan Kapasitas Produksi Ford Line Menggunakan Metode Lean Manufacturing dengan Pendekatan VSM di PT. RST |
Abstract
PDF
|
Dadang Redantan |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
MENINGKATKAN KEUNGGULAN KOMPETITIF PERUSAHAAN PERENCANA DI PASAR GLOBAL: Sebuah Kajian Literature |
Abstract
PDF
|
Fielda Roza, Martalius Peli, Khadavi Khadavi, Vivi Ariani |
|
Vol 4, No 2 (2021): SIGMATEKNIKA, VOL. 4, N0. 2, NOVEMBER 2021 |
Meningkatkan Line Efficiency (LE) Dengan Memperbaiki Bottle Neck Dengan Metode Line Balancing di PT. RST |
Abstract
PDF
|
Dadang Redantan |
|
Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 |
MENINGKATKAN SIFAT PADUAN ALUMINIUM (7075): MENGEVALUASI DAMPAK WAKTU PEMANASAN, PENAHANAN DAN PENDINGINAN |
Abstract
PDF
|
Ery Sugito, Widi Nugraha, Robby Hallun Fasha |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
MENURUNKAN JUMLAH KECACATAN PRODUK PADA PROSES PRODUKSI DENGAN MENGGUNAKAN METODE SIX SIGMA DAN PENGENDALIAN STATISTIK DI PT. XYZ INDONESIA |
Abstract
PDF
|
Zaenal Arifin, Benny Dwika Leonanda |
|
Vol 6, No 1 (2023): SIGMATEKNIKA, VOL. 6, N0. 1, JUNI 2023 |
MESIN MENEPUNG GABLEK TIPE PISAU CACAH SEARAH SUMBU POROS |
Abstract
PDF
|
Yohanes Benediktus Yokasing, Saverius Miku, Amiruddin Abdullah |
|
Vol 7, No 2 (2024): SIGMATEKNIKA, VOL. 7, N0. 2, NOVEMBER 2024 |
MESIN PENGERING IKAN ASIN DAN KERUPUK IKAN MENGGUNAKAN SOLAR CELL DAN ARDUINO SEBAGAI PENGONTROL |
Abstract
PDF
|
Michel Frans Sisco Napitupulu, Novavictorianto Yosep Kunia, Adelia Suherman, Raya Hidayat Borrong, Zaenal Arifin |
|
Vol 1, No 2 (2018): Sigma Teknika Vol 1 No 2 November 2018 |
MODIFIKASI DESAIN TRAKTOR TANGAN “TEMBESI” (STUDI KASUS DI PERKEBUNAN “TEMBESI”) |
Abstract
PDF
|
Agus Supono, Agus Umar Ryadin, Fadhlem Bassar Minta |
|
Vol 2, No 1 (2019): Sigma Teknika Vol.2 No.1 Juni 2019 |
MODIFIKASI DESAIN TRAKTOR TANGAN “TEMBESI” (STUDI KASUS DI PERKEBUNAN “TEMBESI”) |
Abstract
PDF
|
Agus Supono, Agus Umar Ryadin, Fadhlem Bassar Minta |
|
Vol 4, No 1 (2021): SIGMATEKNIKA, Vol. 4, N0. 1, Juni 2021 |
MOTIF PLAFON ANALOGI ALAM |
Abstract
PDF
|
Umiyati Umiyati |
|
Vol 5, No 2 (2022): SIGMATEKNIKA, VOL. 5, N0. 2, NOVEMBER 2022 |
MUSEUM BAHARI DENGAN KONSEP MODERN FUTURISTIK DI KOTA BATAM |
Abstract
PDF
|
Syahrul Khoir, Septy Karmawan, Laras Mitra |
|
Vol 1, No 1 (2018): Sigma Teknika Vol 1 No 1 Ferbuari 2018 |
MUSEUM BUDAYA MELAYU DENGAN PENEKANAN ARSITEKTUR MODERN |
Abstract
PDF
|
Kurniawan Amin Sampurno, Supriyanto Supriyanto, Teddy Tambunan |
|
VOL 7, NO 1 (2024): SIGMATEKNIKA, VOL. 7, N0. 1, JUNI 2024 |
OPTIMASI PENGELOLAAN ASET PT XY MANUFACTURING BATAM |
Abstract
PDF
|
Rizki Prakasa Hasibuan, Larisang Larisang |
|
91 - 105 of 262 Items |
<< < 1 2 3 4 5 6 7 8 9 10 11 12 > >> |