Abstract
ABSTRACTThis research is to analyze capacity requirements and availability on the production line. This research in PT CSB project FORD P702 HVPO production line. Data analysis used the Rough Cut Capacity Planning (RCCP) method by measuring work (time study), forecasting, aggregate planning, master production schedule and capacity analysis with RCCP.Based on research, standard time is 745 seconds / unit for new prodject FORD P702 HVPO. The best forecasting method is use Single Moving Average with an MAD error value of 0.04 and MSE error value of 0.021. Aggregate planning calculation results is 27144 units per year with cost of Rp 49,563,348 per year. And the conclusion is the capacity of the FORD P702 HVPO production line is sufficient and feasible to meet customer needs. This research is calculated based on the total production capacity of 19,958,400 seconds per unit in 1 year and the total required capacity of 18,618,775 seconds per unit in 1 year.References
Faisal, M. (2018). Perang Dagang AS VS China: Bagaimana Dengan Indonesia? In Uraian Diskusi Keadilan Ekonomi IGJ.
Jurnal Teknik Industri USU, 2(1), 15–23.
Ishak, A. (2019). Manajemen Operasi (2nd ed.). Retrieved from http://usupress.usu.ac.id
Kesavan, R., Elanchezhian, C., & Ramnath, B. V. (2009). Proses Planing and Cost Estimation (2nd ed.). New Age International (P) Ltd.,Publishers.
Matswaya, A., Sunarko, B., Widuri, R., & Indriati, S. (2019). Analisis Perencanaan Kapasitas Produksi Dengan Metode Rought Cut Capacity Planning (RCCP) Pada Pembuatan Produk Kasur Busa (Studi Pada Pt Buana Spring Foam di Purwokerto). Performance, 26(2), 128.
Pujiatmo, S. (2013). Studi Deskriptif Pengelolaan Dan Pengembangan Usaha Pada Kecap Tiga Udang Di Madura. Agora, 1(1).
Rachman, T. (2016). Penggunaan Metode Work Sampling untuk Menghitung Waktu Baku dan Kapasitas Produksi Karungan Soap Chip di PT. SA. Jurnal Inovasi, 9(1), 48–60.
Rinawati, D. I., Sari, D. P., & Muljadi, F. (2013). Penentuan Waktu Standar Dan Jumlah Tenaga Kerja Optimal Pada Produksi Batik Cap (Studi Kasus: Ikm Batik Saud Effendy, Laweyan). JaTi Undip : Jurnal Teknik Industri, 7(3), 143–150. https://doi.org/10.12777/jati.7.3.143-150
Rusdiana, (2014). Manajemen operasi. Retrieved from http://digilib.uinsgd.ac.id/8788/1/Buku Manajemen Operasi.pdf
Setiabudi, Y., Afma, V. M., & Irwan, H. (2018). Perencanaan Kapasitas Produksi ATV12 Dengan Menggunakan Metode Rough Cut Capacity Planning (RCCP) Untuk Mengetahui Titik Optimasi Produksi (Studi Kasus di PT Schneider Electric Manufacturing Batam ). Jurnal Profisiensi, 6(2), 80–87.
Keywords

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
PROFISIENSI uses an exclusive license agreement. The authors will retain copyright along with the rights for academic use, while Universitas Riau Kepulauan will be granted publishing and distribution rights.
Open-access authors retain the copyright of their papers, and all open-access articles are distributed under the terms of the Creative Commons Attribution License (CC-BY), allowing others to distribute and copy the articles as long as the original work is properly cited.
Users cannot represent authors as support for the adaptation of their articles and do not change articles in such a way as to damage the honor or reputation of the author.