PENGUKURAN WAKTU KERJA DENGAN METODE STOPWATCH TIME STUDY PADA KONVEKSI GALERI HEBU
Abstract
Keywords
Full Text:
PDFReferences
Baharuddin, A. V., Afris, W. H., & Saputri, Y. I. (2022). Pengukuran Waktu Kerja Standar pada Proses Produksi di IKM Donat Kampar Galesong. Journal of Agro-Industry Engineering Research, 1(1), 58-62.
Purbasari A, Reginaldi. 2020. Pengukuran Waktu Standar Pada Proses Pemasangan IC Program Menggunakan Metode Jam Henti. Fakutas Teknik. Universitas Riau Kepulauan. Vol.8 No.2;116-128.
Sritomo, Wignjsoebroto. 2008. Ergonomi, Studi Gerak dan Waktu. Penerbit Guna Widya
Wignjosoebroto, S. (2003). Pengantar teknik dan manajemen industri. Surabaya: Guna Widya, 2.
DOI: https://doi.org/10.33373/profis.v12i2.6595
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
E-ISSN 2598-9987
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
PROFISIENSI: Jurnal Program Studi Teknik Industri
Building A, 1st Floor, Faculty of Engineering, University of Riau Kepulauan
Jl. Pahlawan No.99, Batu Aji, Batam, Kepulauan Riau
Email: Profisiensi@journal.unrika.ac.id