Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Current
Archives
About
About the Journal
Submissions
Search
Register
Login
Home
/
Archives
/
Vol. 4 No. 1 (2016): PROFISIENSI JOURNAL EDISI BULAN JUNI 2016
Vol. 4 No. 1 (2016): PROFISIENSI JOURNAL EDISI BULAN JUNI 2016
Published:
2017-02-07
Articles
PERANCANGAN JIG BERDASARKAN STUDI GERAK DAN WAKTU DALAM MENDUKUNG PENYELESAIAN FAILURE ANALYSIS CUSTOMER RETURN DI PT.EXCELITAS TECHNOLOGIES BATAM JIG DESIGNING BASED ON MOTION AND TIMING STUDY TO SUPPORT FAILURE ANALYSIS CUSTOMR RETURN DISCOVERY AT PT. EXCELITAS TECHNOLOGIES BATAM
Achmad Yunus, Refdilzon Yasra, Hery Irwan
ANALISA PERCOBAAN TERHADAP TINGKAT CACAT MALFORMBOND (GOLF BALL) PADA PROSES WIRE BOND DI MESIN SINKAWA (UTC-WB) DENGAN METODE ANOVA EXPERIMENTS ANALYSIS OF MALFORMBOND DEFECT (GOLF BALL) FOR WIRE BOND PROCESS IN SINKAWA MACHINE (UTC –WB) BY ANOVA METHOD
Afrian Syafitri, Vera Methalina Afma, Refdilzon Yasra
PENENTUAN KONSUMSI OKSIGEN (VO2) MAKSIMAL TERPAPAR TEMPERATUR DETERMINATION OF OXYGEN CONSUMPTION (VO2) MAXIMUM OF EXPOSURE TEMPERATURE
Annisa Purbasari
PENGARUH JENIS MUSIK TERHADAP SHORT TERM MEMORY PADA MAHASISWA PEKERJA (Studi Kasus Mahasiswa Teknik Industri Universitas Riau Kepulauan) THE INFLUENCE OF MUSIC TOWARD SHORT TERM MEMORY ON WORKERS STUDENT
Benedikta Anna Haulian Siboro
PENGENDALIAN REJECT CONTAMINATION ON MARKING PADA PROSES MARK SCAN PACK (MSP) DENGAN PENDEKATAN SIX SIGMA (Studi Kasus di PT. Infineon Technologies Batam) THE CONTROL OF REJECT CONTAMINATION ON MARKING OF MARK SCAN PACK PROCESS (MSP) BY SIX SIGMA APPROACH (Case Study in PT. Infineon Technologies Batam)
Icen Ritme Parlindungan Siallagan, Dadang Redantan, Zaenal Arifin
PERENCANAAN SISTEM PERAWATAN ALAT ANGKAT KAPASITAS 5 TON DENGAN METODE PREVENTIVE MAINTENANCE (Studi Kasus PT.Trikarya alam ) THE MAINTENANCE SYSTEM PLANNING OF LIFT TOOL WITH CAPACITY 5 TON USING PREVENTIVE MAINTENANCE METHOD (Case Study PT.TRIKARYA ALAM)
Patardo Simanungkalit, Refdilzon Yasra, Bambang Wahyu Widiodo
ANALISA PERCEPATAN PROYEK DENGAN CRITICAL PATH METHOD PADA PROYEK PEMBANGUNAN RUANG AKOMODASI 50PACK AWB (Studi Kasus PT. Trikarya Alam) THE ANALYSIS OF ACCELERATE PROJECT FOR CONSTRUCTION PROJECT OF ACCOMODATION ROOM 50 PACK AWB USING CRITICAL PATH METHODE (Case Study PT. Trikarya Alam)
Tarifar Bangun D., Hery Irwan, Annisa Purabasari